(A) Bhakkar
(B) Sahiwal
(C) Kasur
(D) Sheikhupura
The answer is: (C) Kasur
Balloki Power Plant to generate 1223 MW of electricity was inaugurated on 15 July 2018. It is located in Kasur.
(A) Bhakkar
(B) Sahiwal
(C) Kasur
(D) Sheikhupura
The answer is: (C) Kasur
Balloki Power Plant to generate 1223 MW of electricity was inaugurated on 15 July 2018. It is located in Kasur.