(A) Jhelum
(B) Kotli
(C) Jhang
(D) Sheikhupura
The answer is: (C) Jhang
The Haveli Bahadur Shah Power Plant to generate 1230 MW of electricity was completed on 10 May 2018. It is located in Jhang.
(A) Jhelum
(B) Kotli
(C) Jhang
(D) Sheikhupura
The answer is: (C) Jhang
The Haveli Bahadur Shah Power Plant to generate 1230 MW of electricity was completed on 10 May 2018. It is located in Jhang.
(A) Jhelum
(B) Kotli
(C) Jhang
(D) Sheikhupura
The answer is: (D) Sheikhupura
The Bhikki Power Plant to generate 1180 MW of electricity was completed on 19 May 2018. It is located in Sheikhupura.
(A) Bhakkar
(B) Sahiwal
(C) Kasur
(D) Sheikhupura
The answer is: (C) Kasur
Balloki Power Plant to generate 1223 MW of electricity was inaugurated on 15 July 2018. It is located in Kasur.
(A) Kazakhstan
(B) Kyrgyzstan
(C) Tajikistan
(D) Turkmenistan
The answer is: (D) Turkmenistan
(A) 2.97%
(B) 3.97%
(C) 4.97%
(D) 5.97%
The answer is: (D) 5.97%
(A) 2.40
(B) 3.40
(C) 4.40
(D) 5.40
The answer is: (C) 4.40
(A) 4.19
(B) 5.19
(C) 6.19
(D) 7.19
The answer is: (D) 7.19
(A) 4.19
(B) 5.19
(C) 6.19
(D) 7.19
The answer is: (C) 6.19
(A) Ahsan Iqbal
(B) Khawaja Asif
(C) Bilawal Bhutto
(D) Hina Rabbani Khar
The answer is: (C) Bilawal Bhutto
(A) Javed Iqbal
(B) Fasih Bokhari
(C) Aftab Sultan
(D) Lt Gen (retd) Nazir Ahmad
The answer is: (D) Lt Gen (retd) Nazir Ahmad [Since 4 March 2023]